Day Shift — May 8, 2026
Maintenance Work Orders
Technician: R. Patel
2 Critical
3 Scheduled
1 Monitoring
Critical — Machine Down
WO-2026-041
CRITICAL
Opened 9:42am today
Mazak i-200 #2 — Spindle Fault Alarm 138
Machine locked out. Spindle orientation fault on startup. Machine down since 9:42am — production blocked on AP-6678 job (due May 10).
Asset
AP-202
Last PM
Apr 14, 2026
Alarm History
Alarm 138 × 3 (90d)
WO-2026-039
CRITICAL
Opened May 6
Bore Gauge AP-7742 — Calibration Overdue
Gauge cal expired 3 days ago. All AP-7742 in-process inspection results since May 5 are suspect. QE aware — parts on hold pending re-gauge.
Gauge ID
BG-0047
Last Cal
Feb 5, 2026
Cal Due
May 5, 2026
Scheduled — Upcoming PM
WO-2026-044
SCHEDULED
Due May 12
Okuma LB3000 #1 — Quarterly PM
Q2 scheduled maintenance. Spindle oil, way lube, filter change, geometry check. Machine will need 4hr window.
WO-2026-043
SCHEDULED
Due May 14
Haas VF-4 #2 — Coolant System Service
Coolant change + reservoir flush. Follow-up from swing shift pressure issue (May 7). Estimated 2hr window.
WO-2026-040
SCHEDULED
Due May 15
Annual Haas Service Contract — Schedule Visit
Annual contract renewal and service visit due. Contact Haas service rep to schedule. All 3 VF-4 units covered.
Monitoring
WO-2026-038
MONITORING
Flagged May 7
Haas VF-4 #2 — Coolant Pressure, Watch Level
Pressure loss resolved on swing shift. Check reservoir at start of each shift. Service scheduled May 14.
Ask the Assistant